• Project name: An incremental distribution network energy storage project
• Project location: Xiamen, Fujian
• Project time: 2021.5
• Installed capacity: 5.45MW/17.62MWh energy storage
• Area: about 400㎡
• Usage: peak-valley arbitrage/demand electricity bill management • Problem solved: dynamic expansion of substations and voltage sag at the end of distribution network
• Project status: under construction