• Project Name: Energy Storage Power Station Project of a PCB Manufacturing Enterprise
• Project Location: Zhuhai, Guangdong
• Project time: 2020.12
• Installed capacity: 10MW/23.798MWh
• Area: about 1000㎡
• Usage: peak-valley arbitrage / demand-side response /
backup power
• Project Significance: Save electricity bills for enterprises and improve business efficiency
• Solved the problem: short-term power outage caused by high-voltage flicker in thunderstorm weather
• Project Status: Under Construction